RG's Pleiaddes The 7 Star Living Book a site visit
Book a site visit Call +91 97171 18682
Tower elevation at RG Pleiaddes, Sector 1 Greater Noida West

Construction UpdateRG Pleiaddes, Sector 1

Last updated: January 2026

RG Pleiaddes launched in September 2025 and is currently under construction, with completion targeted around September 2029. This page carries the most recent dated site photographs we have on record, updated on a monthly cycle, so anyone tracking a construction-linked payment plan is working from the current picture rather than launch-day renders.

Current Stage of Work

As of the most recent site photographs on record — January 2026 — the project was in an early structural stage consistent with a September 2025 launch: excavation complete across the parcel, raft foundation work under way, and the first tower bases taking shape.

We refresh this paragraph and the photographs below every month, tower by tower, with the slab number reached rather than a general statement. If you want the raw dated photo set for a specific tower, ask and we'll send it.

Photograph set pending upload

This month's dated site photographs are collected on the monthly site visit and published here with a visible date caption on each frame. Until then, the render below shows the approved elevation, and the milestone list records what has actually been signed off.

Ask for this month's photo set

Approved six-tower elevation at RG Pleiaddes, Sector 1 Greater Noida West

Approved elevation, six towersArtistic impression

Aluminium formwork

Built on Mivan Shuttering, Not Just Renders

RG Pleiaddes is built using aluminium formwork — commonly called Mivan — rather than conventional brick-and-block construction. In practical terms, walls and slabs are cast together as a single monolithic RCC pour, which cuts down on the joints and seams where seepage typically starts, tightens dimensional tolerances between one flat and the next, shortens the casting cycle per floor, and gives the finished structure better resistance to seismic movement.

It's a slower story to tell in a brochure than a lobby render, but it's the part of the build that actually determines how the flat holds up ten years in.

  • SystemAluminium formwork (Mivan)
  • StructureMonolithic RCC
  • Joints & seamsSubstantially fewer
  • Casting cycleFaster per floor
  • Seismic performanceImproved over brick-and-block

Sept 2025 → Sept 2029

Milestone Timeline

  • Sept 2025Launch and UP RERA registration
  • Early 2026Excavation, foundation, early tower structure
  • NextSuperstructure — podium to mid-rise, tower by tower
  • ThenSuperstructure completion and external finishing
  • ThenMEP fit-out and internal finishing
  • ThenClubhouse and landscaping
  • ≈ Sept 2029Occupancy certificate and possession

Intermediate dates are governed by the registered RERA timeline and the developer's progress circulars, and are confirmed stage by stage rather than by calendar.

Tentative layout

Where Each Tower Sits

Six towers around a central green spine, with the clubhouse block and podium pool to the east. Tower heights on the tentative plan run from S+24 to S+29. Tap to enlarge.

Tentative site planSubject to approval

Monthly cycle

How We Keep This Page Current

This page is updated on a monthly cycle directly from site-visit photographs and the developer's progress circulars. Photographs are illustrative of the stage of construction at the time they were taken; final specifications, elevations, and finishes are governed by the Agreement for Sale, not by any image on this page.

See It for Yourself

Numbers and photos only go so far. If you're seriously evaluating RG Pleiaddes, book a site visit and walk the tower in person — we'll arrange access and answer questions on the spot.

What is the current construction stage of RG Pleiaddes?

RG Pleiaddes is under active construction following its September 2025 launch. The dated site photographs on this page carry the latest stage, updated monthly.

When is RG Pleiaddes expected to be ready for possession?

Possession is targeted around September 2029, as per the timeline registered with UP RERA under UPRERAPRJ415309/09/2025.

How does a construction-linked payment plan work here?

Each instalment is tied to a completed stage of work rather than a fixed calendar date, so payments track the slab actually cast. We can walk you through the current schedule against the stage on site.